Optimal Practices for Shutdown and Turnarounds

May 27
01:50

2020

Nancy Whitman

Nancy Whitman

  • Share this article on Facebook
  • Share this article on Twitter
  • Share this article on Linkedin

It doesn’t really matter what type of company or power plant you have. When it comes to shutdown, turnaround, and outage projects, there are a couple of things that you need to do first. This is to make sure that you don’t lose production and that machines don’t break in the process.

mediaimage

There are some practices that you should consider doing. This is the only way that you can ensure that nothing will go wrong after a shutdown or an outage. With this information,Optimal Practices for Shutdown and Turnarounds Articles you will get to know the best practices for the planning and execution of shutdowns, turnaround, and outage projects of your company.

The importance of planning shutdowns and outage projects

This is something that needs to be planned. You can just shut down a power plant or have an outage without having planned it first. How, will you restart the process again? What parts are shut down, and can it just restart, or are there a process that needs to be followed?

It’s why a shutdown and outage project needs to be planned. And why you need to make sure that everyone working there is knowing about the shutdown. To ensure that all hands are on deck and ready for restarting.

Planning in advance really essential

Again, it doesn’t matter what type of company, manufacturing company, or power plant you are controlling. It is essential to plan a shutdown, turnaround, and outage in advance. You need to make sure that the shutdown isn’t a complete shutdown of the whole factory. That there are some processes that continue. That every one that is needed for the restart, to be able to be at work ready for restarting.

It is also important to make sure that production won’t be affected by the shutdown or outage. These can just be done when the shutdown and outage were planned in advance.

It is important to let everyone knows beforehand

Putting up notices everywhere so that all the workers can see that there is a planned shutdown or outage on part of the factory or power plant. Workers need to make sure that they know when the shutdown is planned for. And, that those needed for the shutdown and restart is ready to get to work.

It’s why it is important to have a plan of action beforehand. To make sure that everyone affected is notified and that production won’t be affected too much.

Making sure that production is going ahead if possible

Normally with a shutdown, especially for plant maintenance services, it isn’t the whole place that is shut down. This is normally just one part of the power plant or factory. The other parts are going ahead as planned. This is so that there isn’t a complete hold on production. So that not everything in the power plant is at a complete standstill.

Sometimes with an unplanned outage, it is impossible to ensure that production is still going ahead. In this case, it is essential to ensure that it is restarted, and that production is restarting as soon as possible again.

When it comes to shutdowns, turnarounds, and outages, it is essential to make sure that it is planned ahead and that it is planned properly. This is the only way that you can make sure that production can continue and that there isn’t any loss of machinery. It is also important to make sure that everyone working on the plant is notified in advance so that injury can be prevented as well. With this guide, you will know the best practices for shutdowns, turnarounds, and outages of power plants and factories.

CR Asia is a leading industrial maintenance and shutdowns specialist, providing a comprehensive range of services to the oil, gas, chemical, refining and power industries, including mechanical services, mechanical engineering services, heat exchanger maintenance and cleaning services and more.

Article "tagged" as:

Categories: