SpaceX CRS-1 History

Oct 9
08:48

2012

Johnny Diaz

Johnny Diaz

  • Share this article on Facebook
  • Share this article on Twitter
  • Share this article on Linkedin

SpaceX CRS-1 is the third flight for the uncrewed Dragon cargo spacecraft, Space Exploration Technologies Corporation, an American private space transportation company based in Hawthorne, California; a partially reusable spacecraft by Space X (also known as the Space Exploration Technologies Corporation).

mediaimage
It is the fourth overall flight for the company’s two-stage Falcon 9 launch vehicle,SpaceX CRS-1 History Articles a rocket-powered spaceflight launch system. Aside from that, it is also the first SpaceX operational mission under their Commercial Resupply Services contract with NASA, or the “National Aeronautics and Space Administration” (“NASA”), the agency of the United States government that is responsible for the nation’s civilian space program and for aeronautics and aerospace research, for the delivery of cargo to the International Space Station (ISS) by commercial firms. The launch occurred on 7 October 2012 at 20:34 EDT (8 October 2012 at 00:34 UTC).
In May 2012, it was reported that the CRS-1 Falcon 9 had already been transported to Cape Canaveral Air Force Station (“CCAFS”), an installation of the United States Air Force Space command’s 45th Space Wing, headquartered at the nearby Patrick Air Force Base. The CRS-1 Dragon later arrived on August 14, 2012. On August 31, 2012, a Wet Dress Rehearsal (WDH) was completed for the CRS-1 Falcon 9 to test out the systems of the rocket prior to spacecraft integration and launch, and on September 29, a static fire test was completed; both of these tests were completed without the Dragon capsule attached to the launch vehicle stack. The mission passed its Launch Readiness Review on October 5, 2012.