Secrets of Seamless Steel Pipe Production
The production process of general seamless steel pipes can be divided into two types: cold-drawn and hot-rolled. The production process of cold-rolled seamless steel pipes is generally more complicated than hot-rolled.
Tube billet preparation and inspection → tube billet heating → perforation → pipe rolling → steel pipe reheating → fixed (reduced) diameter → heat treatment → finished pipe straightening → finishing → inspection ³ (non-destructive, physical and chemical, bench inspection) → storage
Blank preparation → pickling and lubrication → cold rolling (drawing) → heat treatment → straightening → finishing → inspection
Xiangjia SSAW Steel Pipe Standard
SSAW steel pipe is welded after being bent and deformed into a round shape by a steel strip or steel plate. Materials of SSAW steel pipe: Q235A, ...Seamless Steel Pipes helps to Reconstruction 10 Million Shanty in 5 Years
Seamless steel pipes will help to reconstruction 10 million shanty in 5 years.5 Methods to Improve the Accuracy of LSAW Steel Pipes
5 methods to improve the accuracy of LSAW steel pipes.